top of page


CHP for boiler house. Khmelnytskyi district heating utility — over 20 years of cogeneration
Under normal conditions the units run in parallel with the grid, and electricity generated in excess of the boiler house's own demand is fed into the grid. When the grid goes down, the unit switches to island mode and the boiler house continues to supply heat.
2 days ago4 min read


How to choose a CHP unit, buy a cogeneration unit
The most common mistake is buying CHP for peak load instead of base load. Peaks should be covered from the grid, and CHP should be sized for the base. Otherwise the unit will run under-loaded and won't pay back.
Sep 295 min read


CHP operation case study: how a large farm turned manure into 315 kW of electricity and heat
Manure turns into biogas in the reactor — \"free\" fuel. Digestate (post-reactor humus) becomes valuable organic fertilizer instead of waste. One unit closes three economic cycles at once
Aug 315 min read


Winter 2026/27 preparation checklist: how to keep your production running. Autonomous energy supply
The right question is not 'will I be on time by date X' but 'which solution fits my facility and my horizon'. We have options for the full planned cycle, fast-track, and hybrid.
Aug 208 min read
bottom of page
