top of page
Search

Engine-generator winter service: a 9-point checklist

5 days ago
4 min read

The heating season is the period of peak running hours for an engine-generator. Equipment that ran a few hours a day in summer switches to continuous operation in winter, and any deferred item of the service schedule shows up precisely under load. The purpose of autumn servicing is not to confirm that the unit starts, but to confirm that it will run the season without an unplanned stop.

Autumn engine-generator service checklist: nine items from oil and filters to a load test


1. Engine oil and filters

Oil is changed by running hours, not by the calendar. Dieselmash calculations for the DvGA-500 assume an oil service life of 4,000 hours before replacement, with 500 l of oil in the unit; the oil used is Arian-Ultra Gas or an equivalent approved for gas engines. The oil filters are replaced together with the oil — in the engine (Narva type) and in the turbocharger.

Before the season, the hour counter is checked against the planned interval. If fewer hours remain to the interval than the expected winter running time, the change is made now rather than in the middle of the heating season.



2. Ignition system or fuel equipment

For gas engines, spark plugs and high-voltage leads are checked: electrode condition, gap, insulation. For diesel engines — injectors: spray quality, injection pressure, tightness.

Misfires at low summer load often go unnoticed. At full winter load they turn into lost output and higher specific fuel consumption.



3. Cooling system

Flushing the circuit, replacing the coolant, checking the antifreeze concentration against the freezing point for your region. Separately — radiators and heat exchangers: a fouled surface reduces heat transfer, and the unit overheats exactly when load is at its highest.

In a cogeneration unit the engine cooling circuit is also a heat source: the coolant is heated to 90 °C and delivers heat to the heating system. Fouling of the heat exchanger hits both circuits at once.



4. Exhaust tract and heat recovery

Exhaust gas temperature is 550–600 °C. Checks cover the tightness of the tract, the condition of expansion joints and mountings, thermal insulation, and the recovery heat exchanger for deposits.

A drop in heat recovery from the exhaust does not stop generation, but it removes the second half of the cogeneration economics — the half the unit was bought for.



5. Sealed joints — O-rings and gaskets

Joints of the water and oil systems are checked for leaks, along with the condition of the fastenings. Rubber loses elasticity in the cold: a joint that holds in October can start leaking in the first frost.



6. Gas line

For gas units, the tightness of connections, the operation of shut-off and control valves and the condition of the gas filter are checked. Gas pressure at the inlet is 0.1–4 bar; that the actual pressure falls within this range is confirmed before the season starts.



7. Control system, protections and synchronisation

The control cabinet, protection settings, transfer switch operation, correct transition to island mode and back, synchronisation with the grid. For a cascade, load sharing between the units is checked as well.

This item is verified not on paper but by simulating a grid outage: the unit must take the load within the calculated time.



8. Load test

The final item, which confirms all the previous ones. The engine-generator is brought to working load and holds it for a period agreed with the service team — long enough to reach steady thermal conditions.

Under load, what is invisible at no load becomes apparent: overheating, a drop in oil pressure, unstable frequency and voltage, abnormal vibration. A no-load test does not provide this information.



9. Records and the next interval

The hour counter reading, the list of work performed, the consumables replaced and any findings are recorded. The next service is planned from the running hours, and the approach of scheduled overhauls is assessed.

Schedule by running hours: intermediate overhaul after 40,000 engine hours, major overhaul after 80,000, total service life of the 6ГЧН25/34 and 8ГЧН25/34 engines — 240,000 engine hours. Oil service life per Dieselmash calculations for the DvGA-500 — 4,000 hours before replacement.

The running-hours log is the only way to plan overhauls in advance rather than after a breakdown.



What to allow for in planning

Timing. Servicing is planned before the heating season begins. In the first weeks of cold weather service teams are busy, and stopping the unit costs more.

Consumables. Oil, filters, spark plugs and antifreeze are ordered in advance, according to the unit model and actual running hours.

Continuous sites. Where a stop in generation is unacceptable, servicing is carried out unit by unit during minimum load, and with a cascade — without losing generation.

Approaching an overhaul. If running hours are nearing 40,000, autumn servicing is combined with planning the intermediate overhaul, so as not to stop twice in a row.

Sizing a unit against the load profile is covered in the article “CHP power sizing”. Running without a stop in generation during repairs — in the article “CHP cascades”. Preparing a plant’s energy supply as a whole — in the “Winter preparation checklist”.



Service before the heating season

Send us the unit model, the hour counter reading and the date of the last service. Our specialists will define the scope and timing before the heating season begins.




Comments