top of page


CHP power sizing: how to select the right unit for your site
CHP output is selected against the base load — the consumption level the plant never drops below during working hours. Peak loads are covered from the grid.
Oct 305 min read


CHP cascades: when several units replace a single large one
A site with a base load above 630 kW is covered either by a single higher-output unit or by a cascade of several. The choice is driven by the load profile, continuity requirements and development plans.
Oct 306 min read


CHP for boiler house. Khmelnytskyi district heating utility — over 20 years of cogeneration
Under normal conditions the units run in parallel with the grid, and electricity generated in excess of the boiler house's own demand is fed into the grid. When the grid goes down, the unit switches to island mode and the boiler house continues to supply heat.
Oct 124 min read


DvGA-500 and DvGA-630: technical specs of Dieselmash natural gas engine generators
The DvGA-500 and DvGA-630 cover around 70% of real Ukrainian B2B inquiries: dairy plants, greenhouse complexes, district heating, agricultural facilities.
Aug 46 min read


What is a CHP plant explained simply, how cogeneration works
You pay for fuel once but get two outputs — electrical and thermal energy. That is why the fuel utilization factor in cogeneration reaches 90-92%, whereas a typical power plant achieves only 35-40%.
Jun 225 min read
bottom of page
