CHP power sizing: how to select the right unit for your site
CHP output is selected against the base load — the consumption level the plant never drops below during working hours. Peak loads are covered from the grid.
Oct 305 min read


CHP cascades: when several units replace a single large one
A site with a base load above 630 kW is covered either by a single higher-output unit or by a cascade of several. The choice is driven by the load profile, continuity requirements and development plans.
Oct 306 min read


How to choose a CHP unit, buy a cogeneration unit
The most common mistake is buying CHP for peak load instead of base load. Peaks should be covered from the grid, and CHP should be sized for the base. Otherwise the unit will run under-loaded and won't pay back.
Sep 295 min read